| [1] 王笏曹.钢铁工业给水排水设计手册[M].北京:冶金工业出版社,2002:61-64.
[2] 王平,周少奇.人工湿地研究进展及应用[J].生态科学,2005,24(3):278-281.
[3] 孙桂琴,董瑞斌,潘乐英,等.人工湿地污水处理技术及其在我国的应用[J].环境科学与技术,2006,29(S1):144-146.
[4] Cerezo R G,Suárez M L,Vidal-Abarca M R.The performance of a multi-stage system of constructed wetlands for urban wastewater treatment in a semiarid region of SE Spain[J].Ecological Engineering,2001,16(4):501-517.
[5] Arias C A,Bubba M D,Brix H.Phosphorus removal by sands for use as media in subsurface flow constructed reed beds[J].Water Research,2001,35(5):1159-1168.
[6] Chen T Y,Kao C M,Yeh T Y,et al.Application of a constructed wetland for industrial wastewater treatment:A pilot-scale study[J].Chemosphere,2006,64(3):497-502.
[7] Moon H S,Sun W C,Nam K,et al.Effect of reactive media composition and co-contaminants on sulfur-based autotrophic denitrification[J].Environmental Pollution,2006,144(3):802-807. |