INDUSTRIAL WATER TREATMENT ›› 2009, Vol. 29 ›› Issue (7): 72-75. doi: 10.11894/1005-829x.2009.29.(7).72

Previous Articles     Next Articles

Management and running of CAST technology in Huiyang Wastewater Treatment Plant

Xiong Daiqun1, 3, Wang Qunhui1, Liu Huicheng2, Jiang Jusheng3   

  1. 1. School of Civil and Environment Engineering, Beijing University of Science and Technology, Beijing 100083, China;
    2. Huiyang Wastewater Treatment Plant, Huizhou 516211, China;
    3. Hainan Academy of Agricutural and Reclamation Science, Haikou 570206, China
  • Received:2009-03-15 Revised:2009-03-15 Online:2009-07-20 Published:2010-10-01

惠阳污水厂的CAST工艺管理和运行

熊代群1, 3, 汪群慧1, 刘惠成2, 蒋菊生3   

  1. 1. 北京科技大学土木与环境工程学院, 北京 100083;
    2. 惠阳污水处理厂, 广东惠州 516211;
    3. 海南省农垦科学院, 海南海口 570206
  • 作者简介:熊代群(1978- ),2000年毕业于华南热带农业大学资源与环境系.电话:13687530976,E-mail:watercon@163.com

Abstract:

The running principle of CAST technology and the treatment ways and manner according to different water quantity and quality are briefly described.The treatment result in Huiyang Wastewater Treatment Plant demonstrates that this process is feasible. The treated effluent water quality reaches the First Class Standard of the Pollutant Discharge in the Town Wastewater Treatment Plants(GB 18918—2002).The removal rates of COD,BOD5 and TP are 86%,93% and 85% respectively.

Key words: cyclic activated sludge technology, domestic wastewater, water quality

摘要:

简述了CAST工艺的运行原理及对不同水量和水质生活污水的处理效果.惠阳污水厂运行实践表明,该工艺可行,处理出水水质达到国家《城镇污水处理厂污染物排放标准》(GB 18918—2002)的一级B标准,COD、BOD5、TP去除率分别达到86%、93%、85%.

关键词: 循环式活性污泥工艺, 生活污水, 水质

CLC Number: