Improvement of sewage and sludge treatment by gas washing at the 2500m3 blast furnace in Maanshan Iron and Steel Works
ZHANG Chang-sheng
INDUSTRIAL WATER TREATMENT . 2001, (4): 38 -39 .  DOI: 10.11894/1005-829x.2001.21(4).38